Monday, December 5, 2011

Siding work continues

As of lunchtime today, I'd say about 80% of the siding is up and it looks superb. They are working above the front porch and along the “long back” at the moment. It looks as if an area at the bottom of the “long front” has been left until later, although I'm not sure why. With the heavy plant machinery no longer required, work has begun on the front sidewalk.

<grumble>Inexplicably, no drywall work is being done today.</grumble>

We've had about half of our stuff in storage since we moved out of a single family home in 2008, so I contacted United Mayflower about getting our storage container delivered in January. I also spoke to our moving company James C. Logan (moved us twice before, very happy with their service) to begin the moving arrangements. We still don't have a date for closing, so I've had to be a bit vague. Most of the loose stuff in the apartment is already packed into bankers boxes (perfect for moving) but we still have a little work to do.

1 comment:

  1. With this blog you really took our attention to the points that we never thought about. Thanks for sharing this with all of us.

    Instant Moving Container Quote